1. Installation · Put bleeder upward to eliminate presence of air when trial running; To achieve stable pressure, do not exceed 30cm for the length of pipe. 2. Air Vent · Set-up system pressure at 30 kgf/cm² and turn the bleeder upward position and open the screw; lock tight the screwagain when oil is full of tank. 3. Manual Adjusting Screw · Turn on the manual adjusting screw in clockwise rotation when electric control is out or order, restore to the orginal place after finished. 4. Drain · Provide the return piping from the hydraulic valve to the tank lower than liquid level in the tank. |